AluminiumGRI & GHGMiddle East
An aluminium smelter builds an assurance-ready GHG and GRI inventory
End-to-end GHG and GRI reporting with hotspots quantified and a gap plan the verifier signed off first time.
Integrated aluminium smelter

- time verification pass
- 1sttime verification pass
- hotspots driving 80% of emissions
- 3hotspots driving 80% of emissions
- assurance preparation effort
- −30%assurance preparation effort
The challenge
Energy-intensive electrolysis and anode baking dominated the footprint, but the inventory could not withstand third-party verification.
What we did
- 01Rebuilt the inventory at pot-line and anode-plant level
- 02Documented every factor and boundary decision
- 03Prepared evidence packs for limited assurance
Facing a similar challenge?
Talk to our teamMore case studies
Case studyOil & Gas · Middle EastAn oilfield services group centralises ESG across 16 countries
One on-premise platform replaced country-level spreadsheets, giving the board a single, auditable view of Scope 1, 2 and 3.
Read the story
Case studyRailways & Transport · IndiaA listed railway PSU automates SEBI BRSR across facilities and suppliers
BRSR Core filed on time with value-chain disclosures, and the ESG rating moved up in a single cycle.
Read the story
Case studyCement · IndiaA cement exporter gets CBAM-ready before the definitive period
Product-level embedded emissions, supplier data and declarations, without relying on default values.
Read the story
Case studySteel · IndiaAn integrated steel producer sets a costed net zero pathway
Reduction levers sequenced by abatement cost, so the plan survived the CFO conversation.
Read the story