SteelNet Zero StrategyIndia
An integrated steel producer sets a costed net zero pathway
Reduction levers sequenced by abatement cost, so the plan survived the CFO conversation.
Integrated steel producer

- reduction projects prioritised
- 14reduction projects prioritised
- of emissions addressed by 2030
- 38%of emissions addressed by 2030
- board-approved roadmap
- 1board-approved roadmap
The challenge
The board had a 2050 target but no view of which projects to fund first or what each tonne would cost.
What we did
- 01Baselined blast furnace, BOF and captive power at activity level
- 02Built a marginal abatement cost curve
- 03Tracked each project to delivered tonnes on Karbon
Facing a similar challenge?
Talk to our teamMore case studies
Case studyOil & Gas · Middle EastAn oilfield services group centralises ESG across 16 countries
One on-premise platform replaced country-level spreadsheets, giving the board a single, auditable view of Scope 1, 2 and 3.
Read the story
Case studyRailways & Transport · IndiaA listed railway PSU automates SEBI BRSR across facilities and suppliers
BRSR Core filed on time with value-chain disclosures, and the ESG rating moved up in a single cycle.
Read the story
Case studyAluminium · Middle EastAn aluminium smelter builds an assurance-ready GHG and GRI inventory
End-to-end GHG and GRI reporting with hotspots quantified and a gap plan the verifier signed off first time.
Read the story
Case studyCement · IndiaA cement exporter gets CBAM-ready before the definitive period
Product-level embedded emissions, supplier data and declarations, without relying on default values.
Read the story