InfrastructureGHG AccountingIndia
An EPC contractor consolidates emissions across 40 project sites
Temporary sites, subcontractors and diesel gensets brought into one monthly inventory.
Infrastructure EPC contractor

- sites on one inventory
- 40sites on one inventory
- less manual data entry
- 90%less manual data entry
- instead of annual reporting
- Monthlyinstead of annual reporting
The challenge
Sites opened and closed every quarter, and fuel data arrived as handwritten logs and photos.
What we did
- 01Agentic ingestion of fuel logs, challans and meter photos
- 02Anomaly rules for unit and duplicate errors
- 03Monthly site-level dashboards for project managers
Facing a similar challenge?
Talk to our teamMore case studies
Case studyOil & Gas · Middle EastAn oilfield services group centralises ESG across 16 countries
One on-premise platform replaced country-level spreadsheets, giving the board a single, auditable view of Scope 1, 2 and 3.
Read the story
Case studyRailways & Transport · IndiaA listed railway PSU automates SEBI BRSR across facilities and suppliers
BRSR Core filed on time with value-chain disclosures, and the ESG rating moved up in a single cycle.
Read the story
Case studyAluminium · Middle EastAn aluminium smelter builds an assurance-ready GHG and GRI inventory
End-to-end GHG and GRI reporting with hotspots quantified and a gap plan the verifier signed off first time.
Read the story
Case studyCement · IndiaA cement exporter gets CBAM-ready before the definitive period
Product-level embedded emissions, supplier data and declarations, without relying on default values.
Read the story